You are here: Home Listings Details - Lethbridge Symphony Orchstra Intima V—Strings into Spring with Musaeus
  • Increase font size
  • Default font size
  • Decrease font size
Search

L.A. Beat

EMail Print

Listings

Event 

Title:
Lethbridge Symphony Orchstra Intima V—Strings into Spring with Musaeus
When:
Sat, Apr 9
Where:
Lethbridge
Category:
Classical

Description

Time: 7:30 p.m.

Tickets:$35

Casa - ATB Financial Community Room

Doors open 30 minutes before showtime.


Ronelle Schaufele, viola

Nigel Boehm, cello

Musaeus String Quartet

 

Musaeus welcomes the next generation of splendid string players with guests Nigel Boehm and Ronelle Schaufele. Join us as this exceptional sextet explores classics from Schubert, Dvorak, and Brahms. (Did you know that the Brahms sextet you'll hear is featured in an episode of Star Trek: The Next Generation?)


Schubert - Quartetsatz

Dvorak - String Quartet in D Minor Op.34

Brahms - String Sextet in B flat major 

 

Please note: There will be no intermission. 

Venue

Map
Venue:
Casa
Street:
230 8th Street, South
ZIP:
T1J 5H2
City:
Lethbridge
State:
AB
Country:
Country: ca

Description

www.casalethbridge.ca

 

Casa is the realization of a 20 year dream, shared by many in the Lethbridge arts community, to expand or replace the Bowman Arts Centre. This unique new facility far surpasses the original vision for expansion, and sets a new standard for interdisciplinary arts centres. It is about experimentation, incubation, learning and growing. Casa was built to serve a multi-generational community, with varying art skill sets and interests in all disciplines of the arts.

Designing the building was a comprehensive and collaborative process led by Nyhoff Architecture from (Calgary) working in conjunction with the local architectural firm of Ferrari Westwood Babits. The Architectural team visited numerous arts education institutions and also met with members of the local arts community to define requirements for a truly functional 42,000 square foot art centre. The resulting building design is truly impressive.

Funding for the project were provided by the Federal Build Canada Fund ($6,000,000.), the Provincial MSI Fund ($14,900,000.) and the City of Lethbridge ($200,000).

The ONLY Gig Guide that matters
<<  October 2021  >>
 Su  Mo  Tu  We  Th  Fr  Sa 
       1  2
  3  4  5  6  7  8  9
10111213141516
17
2425
      

Departments

Music Beat

ART ATTACK
Lights. Camera. Action.
Inside L.A. Inside

CD Reviews





Banner
Banner
Banner
Banner
Banner


Music Beat News

Art Beat News

Drama Beat News

Museum Beat News